Description
As mentioned in the previous chapter, Hiryū was the second aircraft carrier included in “The Second Naval Armaments Supplement Program” of 1934. Originally both carriers were supposed to be sister vessels, but the number of design modifications introduced during the construction of Sōryū resulted in many differences between the two. According to the original plans Hiryū was to be completed a year after Sōryū, but her construction (similarly to her predecessor) suffered delays caused by two key factors. The first one was the implementation of the lessons learned during the reconstruction of Kaga, which was going on simultaneously with Hiryū’s construction. Then there was new data available from the early service days of Sōryū, which exposed some of the design’s drawbacks and weaknesses. The number of issues popping up “along the way” was further increased by the Fourth Fleet Incident and by Japan’s withdrawal from the previously signed naval treaties. Considering all those issues, it is not hard to imagine the inevitable impact they had on Hiryū’s original design and construction schedule.
Reviews
There are no reviews yet.